Rating/Documentation Process
- How we calculate rating chart after reduction of non-applicable clause?
- How famous has the GRIHA rating system been for stand-alone domestic buildings?
- How to convince client to go for GRIHA EB (other than EE)?
- Is there a specific format for uploading the clarifications to the comments raised by GRIHA Council after the first review?
- How long does it take to get GRIHA Certification? What is the process for getting the Certification?
- Can the documentation be submitted partially?
- Where can we find the list of documents to be submitted for each criterion?
- Is it necessary to submit the project drawings in CAD format to demonstrate compliance?
- How does GRIHA support a project in getting certification?
- At what stage of the building construction / operation is the rating conferred?
- Is the checklist for GRIHA version 2015 available? If yes, can we have a copy of the excel file?
- What is the process of SVAGRIHA RATING?
- What is the acceptable format for submitting compliance documents for SVAGRIHA certification?
- We wish to register our project for SVAGRIHA which is in the design stage. What kind of assistance is provided by GRIHA Council during the whole registration and documentation process?
- Can pre-certification be done for SVAGRIHA projects?
- What kind of help does GRIHA provide for SVAGRIHA projects?
- How many subsequent stages of submission are in the GRIHA LD certification process?
- If a township is awarded GRIHA - LD rating, do the buildings have to be certified as well? If yes, is the process separate?
- What is the difference between the drawings required for GRIHA LD certification and GRIHA certification?
- For Master plan rating, do we need to submit the documents for the complete site or only for phase 1? What about the documents for subsequent stages?
- Our project is registered for master plan rating and is under construction. At the current stage of construction, we do not have any photographs to demonstrate compliance. How can we upload the images to complete submittal?
- Is there a specific format in which the narratives need to be submitted? Kindly provide some samples for reference.
- What is GRIHA provisional rating?
- What is the duration of the evaluation process?
- What is the evaluation process?
- When can the project submit the documentation?
- Is GRIHA rating applicable to industrial projects as well?
- Is a certified professional required to prepare the documentation for GRIHA rating?